
When Facility Operator Bob’s four 1000-ton chillers couldn’t support the facility’s cooling load, he turned to HP&D to figure out why. Our mechanical team thought that maybe the problem was speed; perhaps the water was moving through the system too quickly and needed to be slowed down. But is it really possible that less flow could mean more cooling? Read more to find out…